Energy Bangla

Energy electricity and environment news portal

Dhaka Saturday,  Dec 16, 2017

Summit LNG Terminal Signs Contract With Geocean SAS And MacGregor

EB Report

Recently Summit LNG Terminal, a subsidiary of Summit Power International, signed a USD 100 Million turnkey contract with marine work contractor consortium comprising of Geocean SAS and MacGregor for design, engineering, procurement, fabrication, installation and testing of the Fixed Infrastructure (FI) for its Floating LNG Storage and Regasification Terminal (FSRT) at Moheskhali, Cox’s Bazar. The project completion date is 16 months from the time of signing.
The Fixed Infrastructure will consist, among others, of Disconnectable Turret Mooring (DTM) plug for FSRU vessel system with anchors (suction piles), flexible riser with floatation and tether system, control and hydraulic umbilical, PLEM, Stern Mooring System (SMS) of FSRU vessel offshore pipelines and landfall works.
In August 2017, Summit LNG Terminal had signed Time Charter Party (TCP) agreement with Excelerate Energy for securing FSRU vessel.

Comment here

Your email won't be public

*

You can use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <strike> <strong>